Subscribe!

Design Plan Review Case Study

With much of the country at Alert Level 2, I thought I'd celebrate by sharing this blog of an awesome and accessible project recently completed by the Greater Wellington Regional Council. I was part of the Be. Lab team who were engaged to review the design plans of this incredible bridge, to ensure that visitors with diverse needs are able to enjoy the spectacular view of the Hutt River and access the beautiful forest on the other side.

Thanks, Greater Wellington council for showing that by considering accessibility from the outset, we can achieve great things for all to enjoy!

View of the new Kaitoke Suspension Bridge over the Hutt River



Comments (0)

No comments yet.

Leave a comment